Evaluation of the modified MAX IV proposal 2009
The Review panel has scrutinized the revised design of the MAX IV facility as described in the Background Report, dated September 2009, provided by MAX-lab. The revised accelerator and technical design as well as the science case were carefully compared to those described in the MAX IV Conceptual Design Report from 2005.